Rack & Stack in India
Rack assembly, rail kits, server and switch mounting, load-balanced placement and labelling to a documented standard. delivered in India by engineers who work to the standards, safety regime and documentation expectations of this market. Mobilisation from Mumbai in 24 hours. India is adding capacity faster than almost any market, across Mumbai, Delhi NCR, Bengaluru, Chennai and Hyderabad. The practical differentiators are BIS-compliant materials, sector regulators with their own rules, and the sheer scale of campus builds.
- Mobilisation
- 24 hours
- Hubs
- Mumbai · Bengaluru · Chennai · Hyderabad · Delhi NCR
- Region
- Asia-Pacific
- Mains supply
- 230/415 V, 50 Hz
- On-site languages
- English, Hindi
- Local entity
- Field hubs and partners
The India market
India is adding capacity faster than almost any market, across Mumbai, Delhi NCR, Bengaluru, Chennai and Hyderabad. The practical differentiators are BIS-compliant materials, sector regulators with their own rules, and the sheer scale of campus builds.
We mobilise from Mumbai and Bengaluru and Chennai and Hyderabad and Delhi NCR with a target of 24 hours to site. Mumbai, Bengaluru, Chennai, Hyderabad and Delhi NCR hubs give 24-hour mobilisation in those metros. Tier-2 cities are served by scheduled mobilisation.
Our India footprint
- Mumbai
- Bengaluru
- Chennai
- Hyderabad
- Delhi NCR
Mumbai, Bengaluru, Chennai, Hyderabad and Delhi NCR. Local engineering teams for build-outs and field support at scale.
All 28 covered countriesLocal delivery
How we deliver rack & stack here
Rack build-out in India is measured against IS/ISO/IEC 11801 and IS 16605, and the detail that decides a sign-off is usually mechanical: rack orientation against the containment envelope, correct blanking, and cable entry that does not fight the airflow. Our teams work to 24-hour mobilisation from Mumbai.
- Rack positioning and levelling verified against the facility's containment layout before any equipment is unpacked
- Blanking panels fitted to every unused U — a routine omission that measurably raises inlet temperature in India's higher-density halls
- Cable entry from overhead tray or underfloor, matched to the facility's own routing convention rather than imposed on it
- PDU mounting and phase balance recorded per rack, with 230/415 V, 50 Hz feeds confirmed before power-on
- Weight and seismic/floor-loading checks where the facility specifies them
Standards and compliance in India
Work is signed off against the standards that actually apply here, not the ones our engineers are most familiar with. In India that means IS/ISO/IEC 11801 and IS 16605 as the primary reference, with iec 61935-1 or tia-1152 certification to match the specification as the test regime.
Site safety runs under Factory Act and site-specific permit-to-work regimes. We supply certificates before mobilisation rather than on request.
Standards applied on site
- IS/ISO/IEC 11801 and IS 16605 for cabling, alongside EN or TIA specifications from the client
- TIA-942 tier ratings widely referenced by developers
- IS 732 and NBC 2016 Part 8 for electrical installation
- DPDP Act 2023 and rules for personal data processing
- RBI outsourcing and IT-governance directions for banks and NBFCs
- IRDAI and SEBI guidance for insurance and capital-markets tenants
- MeitY empanelled-auditor requirements for CERT-In directions
Site access and safety
Campus access requires photo ID and advance registration, sometimes with police verification for long-term personnel. Allow 48 hours for first-time access.
- Factory Act and site-specific permit-to-work regimes
- Electrical work by licensed personnel under the state electricity rules
Related work
Rack & Stack delivery cases
DACH · 2024
420-rack hyperscale fit-out, Frankfurt
Three data halls brought to production in a single quarter, with configuration drift controlled by wave-based validation rather than end-of-project inspection.
Iberia · 2024
Rolling customer deployments, Lisbon colocation
A standing delivery partnership absorbing customer deployment requests the provider's in-house team could not schedule, executed to the facility's own standard and paperwork.
UK & Ireland · 2023
Two server rooms migrated in one weekend, London
A consolidated move of two legacy server rooms into a colocation suite over a single 54-hour window, with rollback positions agreed before anything was de-racked.
Local questions
Working in India
Do you use BIS-compliant materials?
Yes. Cables, cords and accessories are BIS-marked where the standard applies, and we supply the conformity documentation with the handover pack.
Can you support RBI or IRDAI-regulated tenants?
We provide the change records, test evidence and asset documentation those regulators expect from a service provider. We do not provide regulatory advice.
How do you handle large campus builds?
With a fixed team and a phased plan, so knowledge stays on site and quality does not drift across phases. We size crews per phase and report daily.
Elsewhere
Rack & Stack in other markets
Same service, different standards. Pick the market you are building in.