Structured Cabling
Copper and fibre builds, containment, patching, labelling, certification and test results you can hand to an auditor.
- links certified
- 100%
- links certified
- to 500 MHz
- Cat 6A
- to 500 MHz
- fibre traces on request
- OTDR
- fibre traces on request
What this service is
We install and certify copper and fibre to the standard your design calls for — Cat 6A, OM4/OM5 and OS2 — with containment, dressing and bend-radius discipline that keeps the hall maintainable for the next ten years.
Every permanent link is tested and certified, not just checked for a link light. You receive the full test results per link, with failures re-terminated and re-tested until they pass, and a labelling scheme that matches the administration standard you are already running.
Deliverables you receive
- Certification test results per permanent link (native tester export + PDF)
- Fibre loss budget and OTDR traces where specified
- As-built cabling schedules and patching tables
- Photographic record of containment, terminations and labelling
What is included
- Copper Cat 6/6A horizontal cabling, termination and patching
- Fibre OM3/OM4/OM5 multimode and OS2 singlemode installation
- MPO/MTP trunking, breakout harnesses and cassette installs
- Containment: overhead tray, underfloor, basket and conduit routing
- Cable dressing, separation of copper and fibre, bend-radius control
- Patch panel build-out and cross-connect management
- Fluke DSX / OptiFiber certification testing with per-link results
- Administration labels to TIA-606-D and your naming convention
What is not included
Stated up front so the scope boundary is never a surprise. Most of these are available as add-ons.
- Containment supply outside the agreed bill of materials
- Structural penetrations and fire stopping certification
- Active optics and transceiver supply (installable on request)
- Splice closure and outside-plant fibre works
Method
How we deliver structured cabling
The same sequence every time, so progress is predictable and deviations are visible the day they happen.
01
Survey and route design
We walk the routes, verify containment capacity and produce a cable schedule with lengths, types and label identifiers before ordering anything.
02
Containment and pulling
Routes are prepared, pull strings set and cable drawn with controlled tension and bend radius recorded as we go.
03
Termination
Copper terminated to the specified standard, fibre spliced or connectorised in a controlled, ESD-safe, dust-managed workspace.
04
Certification
Every permanent link tested with a calibrated certifier. Failures are re-worked and re-tested — we do not hand over a partial pass.
05
Administration
Labels applied at both ends plus intermediate identifiers, schedules built, patching recorded.
06
Handover
Test results, schedules and photos issued as a single pack, with failures and re-tests documented for traceability.
Tools we use
- Fluke DSX cable analysers for copper certification
- Fluke OptiFiber Pro OTDR / loss testers
- Fusion splicers and ESD-safe cleaving stations
- Controlled-tension cable pulls and fish rods
- Torque and inspection scopes for connector end-face verification
Standards we work to
- TIA-568.2-D and TIA-568.3-D cabling performance
- ISO/IEC 11801 and EN 50173 series
- TIA-606-D administration
- ANSI/ESD S20.20 and IEC 61340 handling
- BICSI installation practices
Where you already run a documented standard, that becomes our method for the duration of the project. We work to your rack standard, label scheme and change-control process by default.
Related work
Where this service has been delivered
DACH · 2024
420-rack hyperscale fit-out, Frankfurt
Three data halls brought to production in a single quarter, with configuration drift controlled by wave-based validation rather than end-of-project inspection.
Read caseIberia · 2024
Rolling customer deployments, Lisbon colocation
A standing delivery partnership absorbing customer deployment requests the provider's in-house team could not schedule, executed to the facility's own standard and paperwork.
Read caseBenelux · 2024
14,000-link fibre and copper refresh, Amsterdam
A live-facility cabling refresh replacing end-of-life OM3 with OM4 and OS2, delivered in occupied halls without a single unplanned customer outage.
Read case
Questions
Structured Cabling — the usual questions
Do you certify every link or sample?
Every permanent link, 100%. Test results are exported natively from the certifier so they cannot be edited, and we hand over the raw export alongside the PDF summary.
Can you work to our existing label scheme?
Yes — send the naming convention and we build to it. If you do not have one, we propose a TIA-606-D compliant scheme for approval before termination starts.
What happens to links that fail certification?
Re-terminated and re-tested on site at no extra charge. Both the failure and the re-test appear in the results so the record is complete.
Do you supply the cable and components?
We can, from your approved vendor list, or install client-supplied materials. Either way we check in and record every reel and component received.