Rack & Stack in Germany

Rack assembly, rail kits, server and switch mounting, load-balanced placement and labelling to a documented standard. delivered in Germany by engineers who work to the standards, safety regime and documentation expectations of this market. Mobilisation from Frankfurt in 6 hours. Frankfurt is continental Europe's densest interconnection market, and German operators document everything. The commercial reality is that a field engineer who cannot produce a German-language test record and a signed Übergabeprotokoll is not useful, however fast they are.

Mobilisation
6 hours
Hubs
Frankfurt · Berlin · Munich
Region
DACH
Mains supply
230/400 V, 50 Hz
On-site languages
German (native), English
Local entity
Field hubs and partners

The Germany market

Frankfurt is continental Europe's densest interconnection market, and German operators document everything. The commercial reality is that a field engineer who cannot produce a German-language test record and a signed Übergabeprotokoll is not useful, however fast they are.

We mobilise from Frankfurt and Berlin and Munich with a target of 6 hours to site. Frankfurt, Berlin and Munich hubs give six-hour mobilisation. German operators frequently require written change approval (Änderungsantrag) before the window opens — allow two working days.

Our Germany footprint

  • Frankfurt
  • Berlin
  • Munich

Frankfurt hub — our largest continental operation. Full coverage of FRA, plus Berlin, Hamburg, Munich and Düsseldorf.

All 28 covered countries

Local delivery

How we deliver rack & stack here

Rack build-out in Germany is measured against DIN EN 50173 and DIN EN 50174 — the normative reference, not a guideline, and the detail that decides a sign-off is usually mechanical: rack orientation against the containment envelope, correct blanking, and cable entry that does not fight the airflow. Our teams work to 6-hour mobilisation from Frankfurt.

  • Rack positioning and levelling verified against the facility's containment layout before any equipment is unpacked
  • Blanking panels fitted to every unused U — a routine omission that measurably raises inlet temperature in Germany's higher-density halls
  • Cable entry from overhead tray or underfloor, matched to the facility's own routing convention rather than imposed on it
  • PDU mounting and phase balance recorded per rack, with 230/400 V, 50 Hz feeds confirmed before power-on
  • Weight and seismic/floor-loading checks where the facility specifies them

Standards and compliance in Germany

Work is signed off against the standards that actually apply here, not the ones our engineers are most familiar with. In Germany that means DIN EN 50173 and DIN EN 50174 — the normative reference, not a guideline as the primary reference, with certification to iec 61935-1 as the test regime.

Site safety runs under DGUV Vorschrift 3. We supply certificates before mobilisation rather than on request.

Standards applied on site

  • DIN EN 50173 and DIN EN 50174 — the normative reference, not a guideline
  • DIN EN 50600 series, including 50600-4 for operational management
  • IEC 61935-1 for installed cabling certification
  • BSI IT-Grundschutz where the customer is public sector or critical infrastructure
  • TISAX for automotive and supply-chain customers
  • NIS2 through the German implementation, plus KRITIS obligations for affected operators
  • EU GDPR under Bundesdatenschutzgesetz

Site access and safety

Personnel vetting is common in Frankfurt facilities. We provide named engineer lists in advance, photo ID on arrival and signed NDAs. Some operators require a Werkschutz escort for the full duration.

  • DGUV Vorschrift 3 for electrical installations and equipment testing
  • SiGeKo coordination and written Gefährdungsbeurteilung where construction work is involved
  • SCC or equivalent safety certification for contract engineers on industrial sites

Local questions

Working in Germany

Do you provide test documentation in German?

Yes. Native XML test results plus a German-language PDF handover and Übergabeprotokoll. The record is written to be handed straight to an auditor.

Can your engineers satisfy BSI or TISAX audits?

Our engineers work to BSI IT-Grundschutz handling expectations and we can produce the personnel and process evidence a TISAX assessment asks for. We are not a certification body and will not claim to be.

How do you handle DGUV V3 obligations?

Electrical testing of equipment is a separate competence from our install scope. We can identify what needs testing and hand it to a qualified Prüftechniker, or work alongside yours.