Standards & evidence
- UNE-EN 50173 and UNE-EN 50174 for cabling
- UNE-EN 50600 for facility design and operations
- REBT (Reglamento Electrotécnico para Baja Tensión) for electrical installation
Madrid has become one of Europe's fastest-growing colocation markets, with Marseille–Madrid fibre routes and new subsea landings pulling capacity south. Spanish-language site crews are the norm outside hyperscale campuses.
Madrid · Barcelona
Local delivery context
The customer’s site rules and contract take precedence. Standards, access requirements and response times are confirmed for your specific facility during scoping.
Services in Spain
Choose a service for the local delivery method, applicable standards and scope.
Rack assembly, rail kits, server and switch mounting, load-balanced placement and labelling to a documented standard.
Local service detailsCopper and fibre builds, containment, patching, labelling, certification and test results you can hand to an auditor.
Local service detailsPhysical install, ESD-controlled handling, firmware baseline, BIOS/BMC configuration and burn-in before handover.
Local service detailsOS imaging, hypervisor build-out, hardening and application deployment aligned to your platform standard.
Local service detailsSwitch and router bring-up, uplinks, VLANs, cross-connects and connectivity validation with evidence.
Local service detailsEnd-to-end acceptance testing, documented results and a handover pack that stands up to audit.
Local service detailsOn-demand hands in the hall: reboots, swaps, cable changes, visual checks and evidence back to you in minutes.
Local service detailsAsset removal, data-safe handling, site-to-site relocation and disposal with full chain of custody.
Local service detailsSLA-based field coverage: hardware replacement, scheduled health checks, spares handling and escalation.
Local service detailsAccess & working windows
CAE documentation (coordinación de actividades empresariales) is routinely required before contractors enter Spanish sites. Allow time for the exchange.
Madrid and Barcelona hubs give six-hour mobilisation on the peninsula. Balearic and Canary Islands work is scheduled, not on-call.
Working languages: Spanish (native), English, Catalan where required.
Power & testing
230/400 V, 50 Hz. IEC 60320 C13 and C19; Type F on auxiliary circuits.
IEC 61935-1 certification with Spanish-language reporting. Fibre tested to IEC 61280-4-2.
Local questions
Yes. We supply the coordination paperwork Spanish operators require before site entry, including risk assessment, training records and insurance certificates.
Yes, as scheduled mobilisation from Madrid with travel planned in. We quote these as planned projects rather than emergency response, and we say so up front.
Yes. Outside the large hyperscale campuses in Madrid, Spanish is the working language, and our engineers brief site staff in Spanish.