Standards & evidence
- BS EN 50173 and BS EN 50174 for cabling
- BS EN 50600 for facility design and operations
- BS 7671 (IET Wiring Regulations) for electrical installation
- TIA-942 where a US-headquartered customer imposes it
London's Slough and Docklands clusters plus Manchester and Edinburgh give a mature colocation market. The distinctive constraint is the CDM regime: as soon as work is construction, principal-contractor duties and written method statements apply, and operators audit for them.
London · Manchester
Local delivery context
The customer’s site rules and contract take precedence. Standards, access requirements and response times are confirmed for your specific facility during scoping.
Services in United Kingdom
Choose a service for the local delivery method, applicable standards and scope.
Rack assembly, rail kits, server and switch mounting, load-balanced placement and labelling to a documented standard.
Local service detailsCopper and fibre builds, containment, patching, labelling, certification and test results you can hand to an auditor.
Local service detailsPhysical install, ESD-controlled handling, firmware baseline, BIOS/BMC configuration and burn-in before handover.
Local service detailsOS imaging, hypervisor build-out, hardening and application deployment aligned to your platform standard.
Local service detailsSwitch and router bring-up, uplinks, VLANs, cross-connects and connectivity validation with evidence.
Local service detailsEnd-to-end acceptance testing, documented results and a handover pack that stands up to audit.
Local service detailsOn-demand hands in the hall: reboots, swaps, cable changes, visual checks and evidence back to you in minutes.
Local service detailsAsset removal, data-safe handling, site-to-site relocation and disposal with full chain of custody.
Local service detailsSLA-based field coverage: hardware replacement, scheduled health checks, spares handling and escalation.
Local service detailsAccess & working windows
Photo ID, signed NDA and often a basic DBS check for sites with public-sector tenants. Slough and Docklands facilities typically need 24–48 hours notice for escorted access.
London and Manchester hubs give six-hour mobilisation across England and Wales. Change advisory boards usually sit weekly, so submit early.
Working languages: English.
Power & testing
230 V single-phase, 400 V three-phase, 50 Hz. IEC 60320 C13 and C19; BS 1363 on auxiliary circuits.
IEC 61935-1 certification, fibre to IEC 61280-4-2 with OTDR traces. Reports written for UK operator sign-off.
Local questions
Yes. Every UK job ships with risk assessments and a written method statement, and we will work as principal contractor or as a contractor under your principal contractor, whichever the project structure requires.
Engineers working on construction-classified sites hold the appropriate ECS card. We provide card details in advance for site registration.
We can supply the change records, test evidence and handover documentation that a financial-services tenant needs for its important business services evidence. We do not provide compliance advice.