Standards & evidence
- EN 50173 and EN 50174 for structured cabling design and installation practice
- EN 50600 for data-centre facility design, availability class and operational management
- IEC 61935-1 for installed cabling test results
Our home market. Lisbon is a subsea landing point for the transatlantic cables and a fast-growing edge and colocation location, which means short cable routes, tight access windows in older buildings and a genuine premium on engineers who can work in Portuguese with the building's own staff.
Lisbon · Porto
Local delivery context
The customer’s site rules and contract take precedence. Standards, access requirements and response times are confirmed for your specific facility during scoping.
Services in Portugal
Choose a service for the local delivery method, applicable standards and scope.
Rack assembly, rail kits, server and switch mounting, load-balanced placement and labelling to a documented standard.
Local service detailsCopper and fibre builds, containment, patching, labelling, certification and test results you can hand to an auditor.
Local service detailsPhysical install, ESD-controlled handling, firmware baseline, BIOS/BMC configuration and burn-in before handover.
Local service detailsOS imaging, hypervisor build-out, hardening and application deployment aligned to your platform standard.
Local service detailsSwitch and router bring-up, uplinks, VLANs, cross-connects and connectivity validation with evidence.
Local service detailsEnd-to-end acceptance testing, documented results and a handover pack that stands up to audit.
Local service detailsOn-demand hands in the hall: reboots, swaps, cable changes, visual checks and evidence back to you in minutes.
Local service detailsAsset removal, data-safe handling, site-to-site relocation and disposal with full chain of custody.
Local service detailsSLA-based field coverage: hardware replacement, scheduled health checks, spares handling and escalation.
Local service detailsAccess & working windows
Photo ID plus signed confidentiality undertaking is standard. Colocation facilities in Lisbon and Porto typically require 24 hours notice for escorted access; we hold standing access agreements with the main facilities.
Lisbon and Porto hubs give same-day response inside Portugal. Change windows are usually overnight 22:00–06:00 WET to avoid tenant impact.
Working languages: Portuguese (native), English.
Power & testing
230/400 V, 50 Hz. IEC 60320 C13 and C19 at the rack; Type F Schuko on auxiliary circuits.
Copper certified to IEC 61935-1, fibre to IEC 61280-4-2 with OLTS and an OTDR trace for every link. Native XML plus a signed PDF per outlet.
Local questions
Yes. Portugal is our headquarters market and the default working language on site is Portuguese, with English used for the technical record and the handover pack.
Four hours is our standard mobilisation target for mainland Portugal, from our Lisbon and Porto hubs. Emergency smart-hands calls are typically attended inside two hours in the Lisbon metro area.
We support landing-station operators with rack build-out, structured cabling and commissioning inside the station. Wet plant and jointing are outside our scope and we will say so rather than subcontract silently.