Standards & evidence
- I.S. EN 50173 and I.S. EN 50174 for cabling
- I.S. EN 50600 for facility design and operations
- I.S. 10101 (ETCI National Rules for Electrical Installations) for electrical work
Dublin hosts an unusually high concentration of hyperscale capacity relative to population, and grid connection constraints mean operators care intensely about anything that reduces on-site rework. Fast right-first-time work is the commercial argument here.
Dublin
Local delivery context
The customer’s site rules and contract take precedence. Standards, access requirements and response times are confirmed for your specific facility during scoping.
Services in Ireland
Choose a service for the local delivery method, applicable standards and scope.
Rack assembly, rail kits, server and switch mounting, load-balanced placement and labelling to a documented standard.
Local service detailsCopper and fibre builds, containment, patching, labelling, certification and test results you can hand to an auditor.
Local service detailsPhysical install, ESD-controlled handling, firmware baseline, BIOS/BMC configuration and burn-in before handover.
Local service detailsOS imaging, hypervisor build-out, hardening and application deployment aligned to your platform standard.
Local service detailsSwitch and router bring-up, uplinks, VLANs, cross-connects and connectivity validation with evidence.
Local service detailsEnd-to-end acceptance testing, documented results and a handover pack that stands up to audit.
Local service detailsOn-demand hands in the hall: reboots, swaps, cable changes, visual checks and evidence back to you in minutes.
Local service detailsAsset removal, data-safe handling, site-to-site relocation and disposal with full chain of custody.
Local service detailsSLA-based field coverage: hardware replacement, scheduled health checks, spares handling and escalation.
Local service detailsAccess & working windows
Hyperscale campuses require advance named-engineer registration, photo ID and often a site-specific induction video completed before arrival. Allow 48 hours for first-time access.
Dublin hub gives eight-hour mobilisation. Campus work frequently runs to a fixed window coordinated with the operator's change calendar.
Working languages: English.
Power & testing
230/400 V, 50 Hz. IEC 60320 C13 and C19; Type G on auxiliary circuits.
IEC 61935-1 certification, fibre to IEC 61280-4-2. Full evidence pack retained for the operator's asset register.
Local questions
Yes. Our teams work to written methods, photograph every stage and hand over evidence packs that a hyperscale operator can drop straight into its asset and change records.
Plan for 48 hours for a new campus. Once our engineers are registered, subsequent mobilisation is inside eight hours and emergency calls faster.
Yes, from Dublin, with Cork and the west served by scheduled mobilisation rather than an on-call rota. We will give you a realistic attendance time rather than a headline number.