TechMathsData center engineering
IrelandOperate

Decommissioning & Migration in Ireland

Asset removal, data-safe handling, site-to-site relocation and disposal with full chain of custody. delivered in Ireland by engineers who work to the standards, safety regime and documentation expectations of this market. Mobilisation from Dublin in 8 hours. Dublin hosts an unusually high concentration of hyperscale capacity relative to population, and grid connection constraints mean operators care intensely about anything that reduces on-site rework. Fast right-first-time work is the commercial argument here.

Mobilisation
8 hours
Hubs
Dublin
Region
UK & Ireland
Mains supply
230/400 V, 50 Hz
On-site languages
English
Local entity
Field hubs and partners

The Ireland market

Dublin hosts an unusually high concentration of hyperscale capacity relative to population, and grid connection constraints mean operators care intensely about anything that reduces on-site rework. Fast right-first-time work is the commercial argument here.

We mobilise from Dublin with a target of 8 hours to site. Dublin hub gives eight-hour mobilisation. Campus work frequently runs to a fixed window coordinated with the operator's change calendar.

Our Ireland footprint

  • Dublin

Dublin corridor — one of Europe's densest data center markets — served from the London hub.

All 28 covered countries

Local delivery

How we deliver decommissioning & migration here

Decommissioning in Ireland carries a data-handling obligation as well as a physical one, and EU GDPR sets the expectation. Media is accounted for unit by unit from removal to the certificate, with no unrecorded steps in between.

  • Serial-level inventory captured at removal and reconciled at destination
  • Data sanitisation to the customer's standard, with certificates issued per device
  • Chain of custody documented for every movement, including intermediate storage
  • Racks, trays and cabling removed and the space left in an agreed condition
  • Waste streams handled by licensed contractors with transfer documentation retained

Standards and compliance in Ireland

Work is signed off against the standards that actually apply here, not the ones our engineers are most familiar with. In Ireland that means I.S. EN 50173 and I.S. EN 50174 as the primary reference, with iec 61935-1 certification as the test regime.

Site safety runs under Safe Pass card required. We supply certificates before mobilisation rather than on request.

Standards applied on site

  • I.S. EN 50173 and I.S. EN 50174 for cabling
  • I.S. EN 50600 for facility design and operations
  • I.S. 10101 (ETCI National Rules for Electrical Installations) for electrical work
  • EU GDPR under the Data Protection Acts 1988–2018, supervised by the DPC
  • NIS2 through the Irish implementation
  • Central Bank of Ireland outsourcing rules for financial tenants

Site access and safety

Hyperscale campuses require advance named-engineer registration, photo ID and often a site-specific induction video completed before arrival. Allow 48 hours for first-time access.

  • Safe Pass card required for construction-classified sites
  • Permit-to-work and lockout/tagout under the operator's electrical safety rules

Local questions

Working in Ireland

Can you work to hyperscale campus standards?

Yes. Our teams work to written methods, photograph every stage and hand over evidence packs that a hyperscale operator can drop straight into its asset and change records.

How long does first-time site registration take?

Plan for 48 hours for a new campus. Once our engineers are registered, subsequent mobilisation is inside eight hours and emergency calls faster.

Do you cover regional sites outside Dublin?

Yes, from Dublin, with Cork and the west served by scheduled mobilisation rather than an on-call rota. We will give you a realistic attendance time rather than a headline number.

Elsewhere

Decommissioning & Migration in other markets

Same service, different standards. Pick the market you are building in.