Standards & evidence
- SS-EN 50173 and SS-EN 50174 for cabling
- SS-EN 50600 for facility design and operations
- SS 437 01 40 (Elsäkerhetsverket regulations) for electrical installation
The Nordics win on low-carbon power and cool climates, and Swedish operators are early adopters of energy and emissions reporting. Expect questions about travel carbon, material EPDs and whether your work supports their CSRD disclosures.
Stockholm
Local delivery context
The customer’s site rules and contract take precedence. Standards, access requirements and response times are confirmed for your specific facility during scoping.
Services in Sweden
Choose a service for the local delivery method, applicable standards and scope.
Rack assembly, rail kits, server and switch mounting, load-balanced placement and labelling to a documented standard.
Local service detailsCopper and fibre builds, containment, patching, labelling, certification and test results you can hand to an auditor.
Local service detailsPhysical install, ESD-controlled handling, firmware baseline, BIOS/BMC configuration and burn-in before handover.
Local service detailsOS imaging, hypervisor build-out, hardening and application deployment aligned to your platform standard.
Local service detailsSwitch and router bring-up, uplinks, VLANs, cross-connects and connectivity validation with evidence.
Local service detailsEnd-to-end acceptance testing, documented results and a handover pack that stands up to audit.
Local service detailsOn-demand hands in the hall: reboots, swaps, cable changes, visual checks and evidence back to you in minutes.
Local service detailsAsset removal, data-safe handling, site-to-site relocation and disposal with full chain of custody.
Local service detailsSLA-based field coverage: hardware replacement, scheduled health checks, spares handling and escalation.
Local service detailsAccess & working windows
Swedish facilities are generally efficient about access with 24 hours notice and photo ID. Some require a signed personuppgiftsbiträdesavtal where personal data could be touched.
Stockholm hub gives fourteen-hour mobilisation. Gothenburg and Malmö are served by scheduled mobilisation from Stockholm or Copenhagen.
Working languages: Swedish, English (default on site).
Power & testing
230/400 V, 50 Hz. IEC 60320 C13 and C19; Type F on auxiliary circuits.
IEC 61935-1 certification, fibre to IEC 61280-4-2, with travel and material carbon recorded per job.
Local questions
Yes. We log distance, mode and materials per job and can report travel and embodied carbon, which supports your Scope 3 and CSRD disclosures.
Our engineers work in English by default in Stockholm facilities and can brief site staff in Swedish where needed. Full Swedish-language documentation is available on request.
Gothenburg and Malmö are served by planned mobilisation, often combined with the Copenhagen hub to cut travel. We will give you an honest attendance time per site.