10h typical mobilisationSouthern Europe

Data center engineering in Italy.

Milan is Italy's interconnection hub and the landing point for several Mediterranean routes. Italian sites are documentation-heavy and the DURC requirement is a hard gate before any contractor sets foot on site.

Milan

Local delivery context

The details that matter on site.

Standards & evidence

  • CEI EN 50173 and CEI EN 50174 for cabling
  • CEI EN 50600 for facility design and operations
  • CEI 64-8 for low-voltage electrical installation

Regulatory context

  • EU GDPR supervised by the Garante per la protezione dei dati personali
  • Perimetro di sicurezza nazionale cibernetica for strategic operators
  • AGID requirements for public-sector and cloud tenants

Safety & site access

  • D.Lgs 81/2008 — DUVRI and PSC where construction-classified work applies
  • PES/PAV electrical competence qualifications under CEI 11-27

The customer’s site rules and contract take precedence. Standards, access requirements and response times are confirmed for your specific facility during scoping.

Access & working windows

Plan around the facility.

DURC (regolarità contributiva) must be valid and exchanged before site entry, along with the DUVRI. This is non-negotiable on Italian sites and takes time on first engagement.

Milan hub gives ten-hour mobilisation across the north. Central and southern Italy are served by planned mobilisation.

Working languages: Italian (native), English.

Power & testing

Verify, then hand over.

230/400 V, 50 Hz. IEC 60320 C13 and C19; Type L (CEI 23-50) and Type F on auxiliary circuits.

IEC 61935-1 certification with Italian-language reporting, fibre to IEC 61280-4-2.

Local questions

Before you build in Italy.

Do you provide DURC and DUVRI documentation?

We provide the contribution-regularity documentation and cooperate fully on the DUVRI. For non-Italian entities the paperwork differs, so we are explicit about which route applies before you commit.

Are your engineers qualified under CEI 11-27?

Electrical competence is held at PES or PAV level as the work requires, and certificates are supplied before mobilisation.

Is documentation delivered in Italian?

Yes — test results, handover and the verbale di collaudo are produced in Italian, with English on request.