TechMathsData center engineering
Central & Eastern Europe2023Illustrative reference

62 edge sites across five countries

A standardised edge build delivered by rotating crews in Poland, Czechia, Germany, Austria and the Netherlands — one method, one documentation set, five countries.

duration
9 months
duration
engineers on site
8
engineers on site
country
PL
country
measured outcomes
4
measured outcomes

62

sites delivered

5

countries

11 → 7h

average on-site time

−41%

support tickets vs prior estate

The challenge

62 sites, most in locations with no local specialist labour, each with a four-hour access window and heterogeneous conditions. The client's previous approach had produced 62 slightly different builds and no consistent documentation, which made support expensive and slow.

The result

All 62 sites delivered to one documented standard, with average on-site time reduced from 11 hours to 7 as the kit and method matured. Support tickets in the first six months fell 41% against the client's prior estate, because every site was documented identically.

“For the first time we could ask about any site and get the same answer format back.”
Edge platform — placeholder

Scope delivered

  • Standardised build kit and documentation template for every site
  • Rack build, network bring-up and uplink commissioning per site
  • Cross-connect coordination with four different carriers
  • Photographic and configuration evidence per site
  • Central register of every site's as-built state
  • Transition into SLA-based field support after build